College Drive Construction
The project is being done in cooperation with the Crow Wing County and the City of Baxter.
The project involves College Drive from CSAH 48 to the intersection of S 5th & Quince.
The project involves upgrading the College Drive corridor from a three lane road to a four lane divided roadway.
A combination of traffic signals and roundabouts will be used for traffic control at intersections.
A trail and sidewalk will be installed to provide safer pedestrian movement through the corridor.
Work involved includes grading, curb and gutter, paving, storm sewer, sidewalk construction, trail construction, signal upgrades,
roundabout construction, retaining walls and landscaping.
|

Project Location Map |
| 
Final Layout
|
Construction Updates
The Contractor, Anderson Brothers Construction of Brainerd, will resume construction of College Drive on Monday, April 9.
Please use the following link for project updates
Project updates will be posted weekly until major construction is completed. All major road items are anticipated to be completed by October 31, 2012.
Project Background and Development
Roundabouts – Further information on benefits and how to use them
Project Contacts
Jeff Hulsether
City of Brainerd
City Engineer
501 Laurel Street
Brainerd, MN 56401
218-828-2309
jhulsether@ci.brainerd.mn.us
|
Ron Bray
WSB & Associates
Project Manger
701 Xenia Avenue S. Ste. 300
Minneapolis, MN 55416
888-541-4800 ext. 177
763-287-7177
rbray@wsbeng.com
|
Bryon Amo
WSB & Associates
Project Supervisor/ Lead Inspector
4140 Thielman Lane
St Cloud, MN 56301
320-420-1255 (cell)
320-252-4900
bamo@wsbeng.com
|
|
|

|
|
|