College Drive Reconstruction
Project Overview
College Drive is a significant east-west corridor for the Brainerd area as it is one of three east-west bridge crossings
over the Mississippi River. Over the past decade traffic on this road has significantly grown. The Average Daily Traffic
(ADT) in 2007 was 14,900 vehicles per day and is expected to continue to grow. As traffic increases, access onto the road
and flow through the corridor will become more difficult. College Drive also provides access to Central Lakes College,
Kiwanis Park and Brainerd High School. These facilities also make the corridor very attractive to pedestrians and bicyclists.
The limited pedestrian facilities and high traffic make this a safety concern. With the growing traffic and safety concerns,
there is a need to improve the road to handle more traffic safely and make the road more pedestrian friendly.
|

Project Location Map |
The City of Brainerd applied for and received Federal Highway Funding to
assist in funding the reconstruction and safety improvements along College
Drive. The City has retained the services of WSB & Associates, Inc. in conjunction
with Westwood Professional Services to develop the proposed improvements,
prepare construction plans, and assist the City during construction. Project
development phase will involve a series of public meetings to engage residential
input and discussion
of roadway widths, sidewalks, trails, intersection configurations, drainage
concerns, and other
input as the City develops the proposed improvements.
|

Proposed Alternative
|
Some of the goals of the project are to improve safety, improve traffic flow, make the corridor pedestrian friendly, and to
provide intersection treatments, traffic signals or roundabouts, at key intersections, while providing an aesthetically pleasing
corridor that minimizes environmental impacts and is cost effective.
The intent of this page is to provide current project information to the public so questions and concerns can be answered. It also
list project contact information so that any questions, comments, or concerns can be answered by those who are most involved with the
projects development. We encourage you to visit the website to receive the most up-do-date information.
Project Design
• Project Location Map
• Project Aerial Map
• Project Layout
(Alternative #3)
• Proposed Cross Section
The proposed project design consists of three roundabouts along College Drive
at the intersections of Mississippi Parkway, SW 4th Street, and S 4th Street.
For more information on roundabouts, what they are, why they are used and
how to navigate them, please visit the City’s roundabout
webpage.
Project Schedule
The following is an estimate of the project schedule. Currently construction
is estimated to begin in the fall of 2010 wiht the majority of the construction
to take place during the summer of 2011.
The
schedule
will
be
updated
as
the
project
develops.
• Project Schedule
Public Meetings
• Open House #1 Announcement
• Open House #1 Presentation (9-30-08)
• Open House #2 Announcement
• Open House #2 Written Comments
• Council Presentation 2-2-09
• Open House #3 Announcement
Project Management Team (PMT)
The main purpose of the PMT is to provide guidance to the consultant on the
direction of the study. The PMT also works as a liaison between the consultant
and the elected officials. The Project Management Team consists of; City
of Brainerd staff, City of Brainerd
elected council members, Central Lakes College, ISD 181, property owners,
MN DOT State Aid, Crow Wing County, Brainerd Lakes Area Chamber of Commerce,
WSB & Associates
and Westwood Professional Services.
Project Alternatives
• Typical College Drive
Section - Typical sections of the College Drive corridor for the different
alternatives proposed.
• Alternative A - Intersection control at 5th & Quince, College Drive & South
4th, College Drive & SW 4th, and College Drive and Mississippi Parkway would
be Traffic Lights with right and left turn lanes.
• Alternative B - Intersection control at 5th & Quince, College Drive & South
4th, College Drive & SW 4th, and College Drive and Mississippi Parkway would
be roundabouts.
• Alternative C - This is a
hybrid of Alternative
A and Alternative B. Intersection
controls at 5th & Quince would be Traffic Signals. Intersection controls
at College Drive & South 4th, College Drive & SW 4th, and College Drive
and Mississippi Parkway would be roundabouts.
Alternative C was the preferred alternative recommended by the PMT and approved
by the City Council on February 2, 2009 to proceed with final design.
Alternative three was the preferred alternative recommended by the PMT and
approved by the City Council on February 2, 2009 to proceed with final design.
Additional information on roundabouts can be found here.
Project Contacts
Should you have any questions, concerns or comments in regards to the College Drive project, please contact one of the following:
Jeff Hulsether
City of Brainerd
City Engineer
501 Laurel Street
Brainerd, MN 56401
218-828-2309
jhulsether@ci.brainerd.mn.us
|
Ron Bray
WSB & Associates
Project Manger
701 Xenia Avenue S. Ste. 300
Minneapolis, MN 55416
888-541-4800 ext. 177
763-287-7177
rbray@wsbeng.com
|
Kate Miner
WSB & Associates
Project Engineer
4140 Theilman Lane, Suite 204
St. Cloud, MN 56301
320-534-5954
kminer@wsbeng.com
|